Alaskan Way Viaduct Replacement Tunnel (97/105)

Buy Add to Lightbox Download
< Prev Next >
Alaskan Way Viaduct and Seawall Replacement - Crews closed the Alaskan Way Viaduct on October 16 & 17 to inspect the structure and ensure that it remains safe for drivers. Both decks of the viaduct will be closed from 6 a.m. to 6 p.m. between Spokane Street and the Battery Street Tunnel. During the closure, Washington State Department of Transportation and city of Seattle crews will inspect the structure for settlement and perform routine maintenance and preservation work such as: Applying a protective covering to exposed rebar; servicing drainage systems and traffic cameras; washing the walls of the Battery Street Tunnel and inspecting its lighting and ventilation systems; and restriping the roadway.
Alaskan Way Viaduct and Seawall Replacement - Crews closed the Alaskan Way Viaduct on October 16 & 17 to inspect the structure and ensure that it remains safe for drivers. Both decks of the viaduct will be closed from 6 a.m. to 6 p.m. between Spokane Street and the Battery Street Tunnel. During the closure, Washington State Department of Transportation and city of Seattle crews will inspect the structure for settlement and perform routine maintenance and preservation work such as:...
more »

Filename: 102.3-0028.jpg
Copyright